Energy Solution

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

FOR FREE CONSULTANCY CALL 011 - 26301816

HOME CONSULTATION SERVICES BUSINESS OPPOURTUNITY CLIENTS CONTACT US
 
OUR CLIENTS

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

AAA MARKETING Pvt.Ltd., NEW DELHI

Please provide the following data for each DG set during at least one hour run.

  • Amps, volts, PF, kW and kWh.
  • Intake air temp and relative humidity.
  • Intake cooling water temp.
  • Cylinder wise exhaust temp.
  • Turbocharger RPM.
  • Charge air pressure.
  • Cooling water temp before and after charge air cooler.
  • Stack gas temp before and after turbocharger.

Attach % engine loading Vs fuel consumption curve (grams/BHP) supplied by OEM

Pl. state whether rectifier/ thyristor loads, wielding loads, furnace loads are attached to DG.

Whether there is unbalanced load on A.C Generator? If yes whether the maximum unbalanced load between phases is more than 10% of the capacity?

How do you do the load sequencing for handling transient load ?

Attach manufacturer data/ technical leaflet wherever possible.

© AAAMarketing Pvt. Ltd. | Website Designing By: Softlogics & Developments