POWER QUALITY

Preliminary Power Analysis on Critical Loads:This is required to ascertain parameter and primary study of Power Conditioning System at critical points. Apprx. Time Duration- One Day (Maximum)

  • Power Audit
  • Harmonics Audit – Harmonics upto 31st with Reliability Check of the System
  • Report would contain- KW Pattern KVA Pattern PF Pattern Harmonics Summary

Walkthrough Energy Audit – will cover following system parameters

(1) All parameters as per option-1

(2) Comprehensive Harmonic Study & Electrical Power Quality analysis for the locations

(3)Visible & Procured data(client’s data) study would involve:-

  • Electric systems
  • Heating ventilation and Air conditioning system
  • Diesel Generators
  • Pumps
  • Lighting
  • Motors and drives

(4) The report will also cover the calculations of savings that could be achieved in each area long with Investments to be made and the Simple Pay Back Period. Apprx. Time Duration- 1 – 2 Days

Intensive Energy Audit :will cover following parameters for the agreed location.

This study would involve an intensive audit of the complete system by our experts, all major loads will be studied thoroughly, analysis will be done and a report having all the data along with expert suggestions will be submitted. A certificate will be issued by a government approved auditor which will be eligible as per Govt. Policies. Exact Rates are subject to (1) after Walk through Audit and (2) Questioner Submitted.

Electrical System

  • Incoming power parameters
  • Main incomer metering
  • Transformer load management
  • Power factor management and distribution losses

Heating ventilation and Air conditioning system

  • Performance evaluation of existing system (both A/c system as well as dehumidifier)
  • Evaporator and condenser effectiveness
  • Cold insulation survey
  • Locations of condensers
  • Leakages
  • Suggested automation to optimize the energy conservation.

Diesel Generators:

  • Performance evaluation of existing DG sets.
  • Evaluation of engine performance
  • Load Characteristics of each DG sets
  • Comparison study of DG & Grid Supply

Pumps:

  • Performance evaluation of existing pumps
  • Specific power consumption of pumps
  • Proposing to down size the pump or introduction of high-efficient pumps.

Lighting:

  • Observation and analysis of existing lighting
  • Existing illumination levels
  • Proposing energy efficient lighting or any other equivalent

Motors and Drivers

  • The study of performance characteristics of existing motors and Starters
  • Transmission Losses (Ex. Belt tension)
  • Noise level
  • The performance evaluation of VFD (existing)
  • Recommendations to reduce losses and efficient